
Just
Some of The Many Capabilities of Electrical Asset Mgmt
Utility
- Basic maintenance
- Cable-ampacity study
- Coordination study
- Demand analysis
- Electrical distribution analysis
- Electrical disturbance analysis
- Electrical parameter analysis
- Ground-mat study
- Ground resistance survey
- Harmonics analysis
- Infrared testing
- Load-flow study
- Maintenance contracts
- Overpotential testing
- Power-factor testing
- Reliability study
- Repair
- Switching-transients study
- Training
- Verify correct installation
Switchgear
- Basic maintenance
- Breaker testing
- Cable-ampacity study
- Coordination study
- Current injection test
- Demand analysis
- Electrical distribution analysis
- Electrical disturbance analysis
- Electrical parameter analysis
- Ground-mat study
- Ground resistance survey
- Harmonics analysis
- Infrared testing
- Load-flow study
- Maintenance contracts
- Overpotential testing
- Power-factor testing
- Reliability study
- Repair
- Switchgear testing
- Switching-transients study
- Training
- Verify correct installation
Transformer
- Basic maintenance
- Demand analysis
- Harmonics analysis
- Infrared testing
- Insulation-resistance testing
- Maintenance contracts
- Overpotential testing
- Polarity testing
- Power-factor testing
- Ratio verification testing
- Reliability study
- Repair
- Training
- Turns-ratio testing
- Verify correct installation
Distribution Switchgear
- Basic maintenance
- Breaker testing
- Cable-ampacity study
- Coordination study
- Current injection test
- Demand analysis
- Electrical distribution analysis
- Electrical disturbance analysis
- Electrical parameter analysis
- Ground-mat study
- Ground resistance survey
- Harmonics analysis
- Infrared testing
- Maintenance contracts
- Reliability study
- Repair
- Short-circuit study
- Switchgear testing
- Switching-transients study
- Training
- Verify correct installation
Motor Control Center
- Basic maintenance
- Cable-ampacity study
- Coordination study
- Demand analysis
- Electrical distribution analysis
- Electrical disturbance analysis
- Electrical parameter analysis
- Electromagnetic field testing
- Ground-mat study
- Ground resistance survey
- Harmonics analysis
- Infrared testing
- Maintenance contracts
- Reliability study
- Repair
- Short-circuit study
- System function testing
- Training
- Verify correct installation
Variable Frequency Drive (VFD)
- Basic maintenance
- Capacitor on filler testing
- Contactor testing
- Cooling fan check
- Coordination study
- Demand analysis
- Electrical distribution analysis
- Electrical parameter analysis
- Harmonics analysis
- Infrared testing
- Inverter inspection
- Load testing
- Maintenance contracts
- Reactor testing
- Reliability study
- Repair
- Static check
- Training
- Verify correct installation
- Wave form testing
Panel board
- Basic maintenance
- Cable-ampacity study
- Coordination study
- Demand analysis
- Electrical distribution analysis
- Electrical disturbance analysis
- Harmonics analysis
- Infrared testing
- Maintenance contracts
- Reliability study
- Repair
- Short-circuit study
- Training
- Verify correct installation
Automatic Transfer Switch
- Basic maintenance
- Demand analysis
- Gen link
- Infrared testing
- Insulation-resistance testing
- Maintenance contracts
- Reliability study
- Repair
- Switching-transients study
- Training
- Verify correct installation
Emergency Switchboard
- Basic maintenance
- Breaker testing
- Cable-ampacity study
- Coordination study
- Current injection test
- Demand analysis
- Electrical distribution analysis
- Electrical disturbance analysis
- Electrical parameter analysis
- Ground-mat study
- Ground resistance survey
- Harmonics analysis
- Infrared testing
- Maintenance contracts
- Reliability study
- Repair
- Short-circuit study
- Switchgear testing
- Switching-transients study
- Training
- Verify correct installation
UPS
- Basic maintenance
- Cable-ampacity study
- Coordination study
- Demand analysis
- Electrical distribution analysis
- Electrical disturbance analysis
- Electrical paramter analysis
- Harmonics analysis
- Infrared testing
- Maintenance contracts
- Ohmmeter testing
- Overpotential testing
- Power-factor testing
- Reliability study
- Repair
- Short-circuit study
- Switching-transients study
- Training
- Verify correct installation
Standby Generator
- Basic maintenance
- Cable-ampacity study
- Coordination study
- Demand analysis
- Engine shut-down testing
- Gen link
- Ground-mat study
- Ground resistance survey
- Harmonics analysis
- Infrared testing
- Maintenance contracts
- Overpotential testing
- Phase-rotation testing
- Power-factor testing
- Relay testing
- Reliability study
- Repair
- Training
- Verify correct installation
Motors
- Basic maintenance
- Cable-ampacity study
- Coordination study
- Demand analysis
- Ground resistance survey
- Harmonics analysis
- Infrared testing
- Insulation-resistance testing
- Maintenance contracts
- Motor-field winding
- Motor-starting testing
- Overpotential testing
- Power-factor testing
- Reliability study
- Repair
- Stator resistance testing
- Training
- Verify correct installation
- Vibration analysis
